How to level a floor before installing vinyl floor tiles.
How to level floor before vct floor tile.
In construction projects leveling compound is most often laid down on the subfloor before the floor is even set.
Before we get started.
Brand x pictures brand x pictures getty images when the old floor material is a still strong ceramic tile surface though you can place the new covering over the tiles as long as you create a smooth surface beforehand.
A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too.
A level subfloor will help your flooring last longer and keep the finish attractive.
Most of these tools you probably already own and if you don t then you will need to get these tools to be able to do this yourself.
For more information download our pdf about types of subfloors.
Leave the vinyl in place for 72 hours.
On the top side of the floor another fix it idea to lay down new hardwood over the existing floor.
Before taking steps to level a floor you must find out why it s not level.
To properly install a new tile surface you should remove the existing vinyl tile grind down as much of the old tile adhesive as possible and then apply the leveling compound to smooth out the surface for the new tile.
Leveling a floor can be either a do it yourself project or a job for the pros depending on what s causing the problem.
Before we get started with the floor leveling there are a few tools you will see that i use in this step.
Vinyl floor tiles are more affordable versions of ceramic tile providing the same look and aesthetic without the actual price tag.
Cover tile floors with floor leveling compound to create a hard level surface before placing a new floor covering.
Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight.
You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
It supports your decorative floor finish whether it s carpet hardwood vinyl laminate or tile.
Test the floor for moisture.
A subfloor is the bottom most structural level of your floor.
Once the compound reaches a creamy consistency pour a thin layer into the sunken sections then smooth out inconsistencies with a hand trowel.
To level a floor start by removing the existing flooring.
When installing laminate vinyl tile or hardwood flooring it s important to know how to level a floor.