Next lay the first row.
How to lay timber flooring.
Face nail each board at the point of every joist and set the nail with a nail set.
Set inch spacers for the expansion gap along the length and at the end between the board and the wall.
Glue will typically set in about 60 minutes hold your trowel at a 45 degree angle spread the glue in small sections.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
How to install click lock engineered hardwood flooring easy home renovation project for beginners.
Pick one that is straight.
Begin by selecting a long board to start the first row.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.
Clamp the board to the saw horse.
Lay the first board on the line you snapped groove toward wall.
Hardwood floors are durable beautiful and a great diy project.
Step 1 let the boards acclimate.
Use the jigsaw to cut the board to shape.
With the floor prepped spread flooring adhesive with trowel spreading enough to work on a few rows at time so the glue doesn t dry.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels.
This was our first time installing hardwood floors and i.
Lay the board in place on the floor.
Align the edge of the board with the chalk line and drill pilot holes down through the hardwood plank and into the sub floor and joist.
If you re not using a flooring nailer drill 1 32 inch diameter holes 1 2 inch from the grooved edge to prevent splitting.
Put on the safety gear.