Lay down a moisture barrier.
How to lay timber flooring on concrete.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Unpack the flooring and spread it around the room to acclimate.
If you are using an old floor and it has previous paint you ll have no other option but to remove it.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
Unlike the moisture barrier you do not want the edges to overlap unless they come with a built in adhesive strip.
Cut pieces as you go.
Install a underlayment on concrete floor in basement over the moisture barrier to help soundproof your floor.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Here are some of our tips for preparing concrete before laying your hardwood timber floor.
Flooring usually takes three to five days to acclimate but the real test of acclimation is when its moisture content as measured by a meter has fallen to within 4 percent of that of the subfloor.
Normal room temperature and humidity conditions must be maintained for the entire.
Follow these steps with care to safely complete the installation yourself.
When you install hardwood floors concrete is one of the best bases to work from there are only a few steps to take.
Always have an exit plan when laying out the floor.
Treated plywood to the concrete with concrete screws spaced every 16 in.
You don t want be trapped in a corner and have to walk on the newly installed floors.
This will prevent any excess moisture from wicking from the concrete directly into the wood.
Moisture can ruin your flooring before you even install it so avoid bringing the flooring into the installation space until the concrete is dry.