Lay the underlay over the entire floor area and trim to fit.
How to lay laminate flooring uk.
Start the second row where you started off the first.
This will stagger the seams which results in a more natural look.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.
Step 1 let the boards acclimate.
If the floor where you need to lay the laminate is uneven your flooring fitter may need to level it using screed which can cost up to 20 per square metre depending on how much work needs to be done.
This is the thinnest type of underlay used under laminate flooring and is good for any firm dry and level sub floor such as chipboard plywood or hardboard.
Use the remainder of the laminate flooring planks you cut at the end of row one to start the next row as long as it s longer than 1 foot.
Cut a 16 mm gap around pipes.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels.
Place unopened packages of laminate flooring in the room or rooms in which they are to be installed.
If it s not start the row with a plank cut to a length greater than 1 foot.
Underlay can also be put down to help beneath a wooden floor which is typically less than 5 per square metre while a damp proof membrane which can be laid over a concrete sub floor is usually only around 20 for an average room.
Prepare the floor and lay a combined underlay and dpm if necessary.
Floating using an underlay is the most common method as it can then be fitted over any type of sub floor.