Larger extensions often benefit from a suspended concrete floor almost all new builds are now built using this system as it is quicker you can walk on it sooner and it reduces any risk of damp coming up through the floor.
How to lay a concrete floor.
Preparation is the most important aspect of pouring a concrete slab.
We go over all the necessary steps for your concrete slab to come out perfect.
A concrete floor is usually laid during renovation work to replace a rotting timber floor.
Do this once the concrete has stiffened enough not to be disturbed by the act of laying the sheeting.
Pull the duplex nails from the corners and kickers and pry up on the stakes with a shovel to loosen and remove the forms.
To help prevent rapid drying you can lay polythene sheeting over your concrete.
Properly preparing the subsurface helps to limit the potential for cracks in the finished concrete slab.
Then build a perimeter or a wood brace that is the same height as you want the concrete to be.
Concrete is porous so you need to erect a concrete slab where drainage is not an issue.
Subsurface water can cause the ground the flex creating stress cracks in the cement.
More complex decorative concrete floor projects involving multiple stain or dye colors an overlay decorative sawcuts and.
Specialist spray can be applied or curing membranes can also be used.
You can lay plastic over the concrete instead although this can lead to discoloration of the surface.
Let the finished slab harden overnight before you carefully remove the form boards.
Laying a concrete floor is major construction.
Make sure the braces are level and lay down a barrier of wire mesh over the existing concrete inside of the barrier.
Beam and block floors.
In this video we show you how to pour your basic 16 x 12 concrete slab.
To lay new concrete sweep and clean the old concrete and saturate the old concrete with water.
Concrete joists with lips on either side about halfway up are placed on the floor.
Typical sight lines run parallel to the longest wall but each home is different.
For big areas that need to be cemented ready mixed concrete from batching plants are preferred because this type of concrete is precise.
The timeline and steps involved to install a decorative concrete floor can vary greatly from job to job.
On a small project such as a basement floor the timeline can range anywhere from two days to five or six days.
For a concrete subfloor you should install the plank with the sight lines of the floor.
Measure and mark the center of all four walls at floor level.