The easiest solution for damp proofing concrete floors is to install a plastic membrane.
How to lay a concrete floor with damp proof membrane.
It sits between the concrete and the underlay floor covering.
Concrete is poured and left to cure for a minimum of three days.
This is more than often an easier and quicker option than using a damp proof coating.
Plastic damp proof membrane.
Either a damp proof coating can be applied to the surface of the concrete or a damp proof membrane can be laid on top of the concrete.
When constructing an extension or a new build home it is important that damp proofing measures are taken during the initial construction phase itself.
Essentially this is a plastic mesh sheet specially formulated to ensure that moisture cannot penetrate.
Underfloor heating pipes are put in place if necessary.
A final screed layer is put in place and left to cure for a week.
This is due to the fact the membrane can be applied onto the damp surfaces so there is little surface preparation that needs to be made.
A damp proof membrane is put down.
A damp proof membrane dpm is used to create a barrier between a concrete or screed subfloor and the floor covering that is laid on top such as wood ceramic or quartz tiles laminate or carpet.
The second option is to use a damp proofing membrane on top of the existing concrete surface.
Most damp proof floor coatings are applied directly to the concrete floor.
Insulation is put down.
These days damp proof membranes are required in the construction of all new buildings to prevent rising damp.
There are however two options for damp proofing concrete floors without needing to replace the floor itself.
All types of floor coverings can be installed on top of a plastic membrane.