I m kind of astounded that your hardwood installer would put the new hardwood right up against the existing baseboards that is a total no no for hardwood installation.
How to install wood floor under existing baseboard.
This gap is needed to give the hardwood room to move with changing humidity.
Wood expands and contracts with the seasons and needs an expansion gap around the perimeter so it doesn t cause buckling in the floor during an expansion time of year.
Then slide the long edge of the flooring under the other baseboard straightening the flooring piece into place.
Nail threshold or transition strips in place where the edge of the floor is exposed.
When attaching the base shoe quarter round nail the molding into the bottom of the existing baseboard and not into the flooring itself.
Fill any nail holes and apply any touch up as needed.
Set the quarter round shoe moulding on a piece of paper to keep it just a hair above the floor.
Use 11 4 to 11 2 in long enough to penetrate the molding the drywall and drive at least 1 2 inch into the wall s base plate.
Install the base shoe quarter round molding over the expansion gap created by your new hardwood flooring.
In this video i share tips and tricks that i have learned over the years to create.
Start by putting the baseboard end of the flooring under the first baseboard at an angle.
Keep the lower edge of the baseboard even with the top of the floor and nail the baseboard into the wall.
Leave a 1 4 inch or larger gap between the existing baseboard and the new hardwood flooring you are installing.
Use baseboard nails or brads no longer than 18 inches apart for 3 4 inch thick molding.