If you lay the laminated flooring on new concrete floors you must know that the period of the complete drying is about 80 days.
How to install laminate flooring on concrete slab.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
If you plan to transform your basement into a high traffic area for entertaining and relaxing laminate could be a great option.
Like other flooring materials that work well over concrete slabs laminate uses layers to fight moisture.
This article is about how to lay laminate flooring on concrete.
Laminate flooring is a popular flooring option because of its attractiveness durability scratch resistance and most importantly its ease of installation.
Before the installation itself leave laminate boards in the room for some time.
Remove any carpet or other flooring.
Multiply length times width of the room.
How to install laminate flooring over concrete.
However many homeowners are disappointed to discover that solid wood flooring cannot be installed on a concrete slab.
Laminates can be laid down on almost all subfloors with minimal preparations which is why many homeowners tackle its installation as a diy project.
How to install laminate flooring over concrete.
The laminate flooring is cheap and comes in a large diversity of colors thicknesses and finishes as you can easily find one to fit your needs and tastes perfectly.
Laminate flooring is a good alternative to wood flooring in basements.
None of the comments refer to a basement concrete floor.
I would like to install my wood laminate over a basement concrete floor using plastic vapor barrier then the wood laminate with no backing.
Allow new concrete to cure for 30 days minimum.
Laminate flooring is also fairly easy to install.
The fact is that moisture vapor passes through a concrete slab rather easily.
Whether it s a basement slab self leveling concrete containing radiant floor heating or other concrete installation.
Here is how to keep it from penetrating into your laminate flooring to cause warping and declamation.
It is necessary for them to adapt to the humidity and the temperature of the.
I believe a concrete slab does not react the same as a basement concrete floor when it comes to moisture.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
This makes it a reliable option to install over your concrete slab.
Add about 10 to that number to account for any possible mistakes and warped boards.
Determine how much flooring and materials will be needed.