Our highly durable and secure glue down system incorporates a junckers liquid moisture barrier which is applied if necessary first to protect against higher than normal residual moisture in the subfloor.
How to install glue down method of wood flooring.
After making sure the surface is completely level and clean place the substrate sheets on the ground and stretch them out properly.
If installing glue down hardwood flooring in a new house completely close the building in with all outside doors and windows in place.
The installation method recommended is not a full glue down installation but only a bead of glue across the width of the board.
In part 3 we will examine the pros and cons of choosing the glue down method of installation.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low spots because the slab must be flat so the planks can fit correctly.
Quick guide on how to install hardwood floor 300kb pdf our short installation guide for those with diy experience.
Helpful tips for glue down installations.
Before the installation begins it is important to perform a thorough job site inspection.
This is your last chance to check if the ground is level and has no lumps or stray rocks so use it wisely.
Glue down hardwood floors is a good solution for large open areas where footsteps and drumming noise needs to be minimised.
As you have read in part 1 part 2 there are multiple methods of installing hardwood flooring both engineered and solid.
Flooring selection lumber liquidators recommends engineered flooring for glue down applications or the more stable.
Installing hardwood flooring glue down method step by step instructions.
Use this method for solid t g hardwood above wood or concrete subfloors.
This is done by introducing glue to the nailing process.
How to install glue down engineered wood flooring on concrete slab preparation.
Full guide complete installation instructions on installing your hardwood floor 1 5 mb pdf our full set of diy installation instructions.
All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.