To properly install tile over concrete the bathroom slab floor needs to be smooth and level.
How to instal a bathroom floor on a concrete slab.
Then if necessary use a self leveling compound to get the floor perfectly level.
It is one of the cheapest solutions and at the time of writing it could set you back just a few hundred bucks depending on the size of the area you are covering.
The previous owner put the really old style tiles on top of concrete.
There are also tiles missing here and there.
Our prior videos showed how to prep and self level the concrete floor which made this instal.
Next cut and remove the portion of the slab necessary to install the plumbing supply and drain lines then repour new concrete over the new plumbing and make the floors as level as possible.
Any cracks in the surface of the slab need to be repaired before you begin as well.
When installing a laminate floor on top of old tile on top of concrete basement floor.
Today we share how to install a bathtub in a basement bathroom.
How to cut a concrete floor for new plumbing.
During new construction the builder installs drain lines and stubs that will connect to future plumbing fixtures before he pours the slab on grade.
Plumbing systems in concrete slabs go in before the concrete is poured as they are installed beneath the slab.
Concrete expands and contracts and that type of movement can also crack the tiles and the grout.
If you ve got additiona.
However you re not out of the woods.
If you have some experience with installing flooring or are diy hobbyist it shouldn t take you more than a day to install vinyl plank flooring on concrete.
But before you can even pour the slab the building inspector must first approve and sign off on the drain waste vent or dwv system.
Building and plumbing a house takes skill perseverance precision and aptitude.
My contractor wants to install laminate on top of floor.