500 750 square feet of coverage.
How to glue laminate flooring to concrete.
What adhesive to use on a concrete wall.
Use a quality cleaner like zep professional concrete and masonry floor cleaner 27 per gallon.
If a floor plank and underlayment or adhesive will not fit under the door remove the door and trim it with a circular saw about 1 8 inch above the level of the new flooring.
Then secure the nosing over top by screwnailing it through the laminate tread into the pre drilled holes in the concrete.
Next use a back saw to cut the wooden door jamb by holding it perfectly level.
This will help to acclimate the flooring to the room temperatures and humidity.
Work with great care otherwise you might scratch the jambs.
Place a piece of underlay on the concrete sub floor and a laminate board on top.
For the floor adhesive to properly stick the floor must be clean.
Using this flooring glue has many benefits including creating a more durable and sturdy flooring.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
You can glue laminate flooring to a concrete wall but you will need a special adhesive to make sure that your planks do not come falling down off of your walls due to the concrete wall having more moisture in it than regular drywall.
This adhesive is specifically designed for this type of flooring and is most often used with traditional wooden laminate.
Using a glue down floor is an option in above grade installation only since installation below grade requires a plastic barrier on top of the concrete.
How to lay laminate flooring on concrete.
You should use a cove base adhesive.
The combination of warmth and water helps to soften the glue which is water soluble unless it has petrified.
Leave the flooring in the room for three days before installation.
If a floor plank and underlayment or adhesive will not fit under the door casing cut the casing with a backsaw about 1 16 inch above the level of the new flooring.
If this is the cut a laminate plank so that it s wide enough to cover the the concrete lip and glue it to the face of the lip on each tread.