Install the roofing screws vertically along each rib in the panel.
How much overlap on metal roofing.
Secure the sheets into place with screws.
If you re installing a metal roof on a home without gutters you can overhang the panels by twice that amount.
Once the first sheet is in place you need to install the remainder of the lowest row of corrugated metal roofing.
The panels overlap allowing water to flow from one panel to the next without being able to penetrate the area under the roofing panel.
The sheets should overlap by at least four inches add a bead of caulk where they overlap and at the other end of the building ensure there s an overhang of two inches.
Any end laps must be supported by a suitable purlin.
Learn how much to overlap the corrugated sheeting.
Install metal panels or shingles align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
How to overlap metal roofing.
Overlapping anti condensation lined sheets.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
As a first line of defense against water damage it is important that the metal roof overlap be implemented correctly.
On the eave side of the roof aim to overhang the panels by 1 to 1 5 inches.
For example if the measured length is 19 feet 10 inches and an additional overlap of 6 inches is required at both ends the final figure will be 21 feet 19 feet 10 inches plus 6 inches times 2.
Installing corrugated metal roofing will require you to lap the m.
Apply side lap sealant if the pitch of your roof is 2 12 or less.